日韩欧美一区二区三区_午夜日韩_日韩中文字幕av_日韩av第一页_中文在线字幕免费观_日日干夜夜爽_超碰免费97_亚洲第九页_性视频网_av在线播放不卡_黄色成人毛片_天天搞天天搞_国产精品99视频_黑丝一区_一级黄色a_日韩福利网站_国产a免费_国产一区二区精品在线观看

Press Center > News Focus
Bai Xiaohu leads a team to inspect the teaching and training complex building project of Guangxi Quality College undertaken by China MCC19
source:Project Performance Management Department Author:Project Performance Management Department Release time:2025-09-17

On September 16, Bai Xiaohu, Member of the Standing Committee of the Party Committee and Vice President of China MCC, led a team to check the teaching and training complex building project of Guangxi Quality College undertaken by China MCC19, and conducted on-site investigations. 

 

Bai Xiaohu went to the construction site, gained a detailed understanding of the project's work safety and contract performance, and carefully listened to the work reports made by the China MCC19 Guangxi Branch and the project department. Combined with the production and operation situation of China MCC19, he put forward specific requirements for the next work. First, it is necessary to enhance high-quality contract performance through fine management. Guided by the Project Management Manual, it is necessary to adhere to high-standard planning, advance fine management, and achieve the "On-site Circular Market" through high-quality and efficient project contract performance, thereby polishing the MCC brand. Second, it is necessary to strengthen profit-oriented operation and create business value. It is necessary to establish the "Grand Business" concept, apply the "Amoeba" management model to refine the management of cost units, strengthen the awareness of profit-oriented operation, clarify responsibilities, implement strict assessments, and improve the profit level of project. Third, it is necessary to shoulder responsibilities and keep the faith. Facing the fierce market competition in the construction industry, it is necessary to create new ideas, take multiple measures, optimize personnel allocation, ensure the safety of cash flow, and firmly hold the business foundation; build a learning-oriented and inter-disciplinary management team. Starting from studying a contract, analyzing a list, understanding a set of drawings, and solving a problem, continuously improve the comprehensive business capability of the project team. Fourth, it is necessary to hold on to the bottom line and prevent risks. It is necessary to adhere to the concept of "putting people and life first" by strictly implementing the work safety responsibility system, strengthening safety management, deepening the investigation and rectification of potential hazards, and comprehensively improving the ability to prevent and control safety risks. Meanwhile, it is necessary to strengthen the construction of the Party conduct and of an honest and clean government and the fight against corruption, thoroughly implement the spirit of the Party's eight-point frugality code, and foster a clean and upright political ecology as well as a sound atmosphere for pursuing undertakings.  

 

Wang Zirui, Deputy Chief Engineer and Safety Director of China MCC, and relevant personnel from the Project Performance Management Department, Ou Chenghua, Secretary of the Party Committee and President of China MCC19, and other relevant personnel, accompanied the inspection. 

 

 

Scene of On-site Inspection

 

Scene of the Conference

Stock information
  • MCC A股 [601618]
  • MCC H股 [01618]

MCC

輕推
Contact Us | Site Map | Terms of Use | Privacy Policy |
phone:010-59869999 fax:010-59869988 Address:28 Shuguang Xili, Chaoyang District, Beijing
All rights reserved by MCC Group ? 2021 Jinggongwang Anbei No. 110401300039 Beijing ICPB 14039545-1 Beijing ICPB No. 2020047078-1